Canyonfalls Creek Pump Station
We need to pressurize a water transmission pipeline
We are fixing an issue with a major pipeline that delivers drinking water. This pipe is one of the biggest in our system (large enough for a person to crouch inside) and it stretches 27 miles. It has carried water since 1913 and is one of two main pipelines that bring water from Tacoma Water’s Green River source.
We need to pressurize this pipeline by 2051 to continue keeping our drinking water safe. To fully pressurize the pipeline, we will complete several projects between now and 2051. All of these projects are part of our larger effort called the Pipeline 1 Pressurization Program.
Why is Tacoma Water doing this now?
The Department of Health has required the utility to make these changes so the pipe will continue to safely serve our customers into the future. The first major construction project under this program is the Canyonfalls Creek Pump Station project. This pump station will help us improve how we move water in the pipeline. We will also do additional work in future projects to complete the Pipeline 1 Pressurization Program.
Who is involved?
Tacoma Water will deliver the Canyonfalls Creek Pump Station project using the Progressive Design-Build method (this method encourages the utility to collaborate early with the contractor to make the design and construction more efficient).
Tacoma Water selected Tapani, Inc. with Windsor Engineers as the design-build team after the Washington State Capital Projects Advisory Review Board approved the decision to use this type of delivery method. Tacoma Water staff also contributed design input.
Jacobs Engineering created the implementation plan for the Pipeline 1 Pressurization Program. Brown and Caldwell is serving as the owner’s advisor for Canyonfalls Creek Pump Station.
The Canyonfalls Creek Pump Station project design began May 2025. Construction will start in November 2026 and be complete in March 2028.
Click here to submit a question or comment