Public Utility Board presentation, 7-13-11
Design consultant MWH delivered 30% design completion documents 9-15-2011.
First value engineering analysis session conducted 9-26 through 9-28-2011.
Design consultant MWH delivered 60 percent design completion documents 1-17-12.
Second value engineering analysis session conducted 1-24-12 through 1-26-12.
Joint City Council/Public Utility Board presentation, 2-7-12