Public Utility Board presentation, 7-13-11

Design consultant MWH delivered 30% design completion documents 9-15-2011.

First value engineering analysis session conducted 9-26 through 9-28-2011.

Design consultant MWH delivered 60 percent design completion documents 1-17-12.

Second value engineering analysis session conducted 1-24-12 through 1-26-12.

Joint City Council/Public Utility Board presentation, 2-7-12